Spike seasoning 676011/4/2023 ![]() ![]() The Lead & Lift Charges are common to all Engineering Departments. The Government approval is necessary to adopt any other data (i.e) MORT&H Data for adopting the Road & Bridge Works (Part-2). The approved basic rates are applicable to the datas as per A.P.Revised Standard Data approved by the Government vide G.O. The Procedure for the adoption of Irrigation work items, lead & lift charges (Common to all departments) is incorporated in the Annexure-A of SoR. Based on the proposals, the draft Schedule of Rates for the year 2012-13 were reviewed and finalized in the annual Board of Chief Engineers meeting held on 14-6-2012. The labour rates are obtained from the Commissioner, labour department vide reference 3rd cited for finalizing the rates for SoR 2012-13. Accordingly, the draft rates for Irrigation & Command Area Development are prepared. The Superintending Engineer, Mechanical Circle, Hyderabad has furnished draft rates of mechanical and workshop items. For Irrigation & CAD Work Items, the regional Superintending Engineers of Irrigation Circles of Hyderabad, Chittoor & Dowlaiswaram in charge of Telangana, Rayalaseema and Andhra regions respectively have submitted the draft basic rates of materials. The ENC(R&B) Department and ENC (P.R) Department have not furnished the SoR as per A.P.Revised Standard Data. The Engineer-in-Chief, Public health Department has furnished draft rates for Public Health Work Items and Public Health materials vide ref 2nd cited. Revised Standard Data for the year 2012-13 is approved based on the following. o0oThe Government have approved Revised Standard Data vide ref 1st cited. Minutes of B.O.CE’s meeting for Schedule of Rates held on dt.14-6-2012. Commissioner, lab our department rates down loaded from Net. Sub: Schedule of Rates as per Revised Standard Data for the year 2012-13 – Irrigation & CAD works (part-1) and Drinking water supply schemes (part-4) - approvedPrinting & Communication of SoRs – Reg.ġ. Office of the Engineer-in-Chief(I.W.) I & CAD Dept., Errum manzil, Hyderabad. ![]() PART-I&PART-IV SCHEDULE OF RATES AS PER A.P. Description From Part –I (Irrigation & CAD Works) & Part – IV (Public Health Work Items) Part-II (Road & Bridges) Part – III (Buildings) Annexure (Seigniorage Charges) To REVISED STANDARD DATAįOR THE YEAR 2012-2013 (Effective from 1st June, 2012) Kudos to the store and especially to Ryan.SCHEDULE OF RATES AS PER A.P. You will always get a tasty meal at Subway, but the town of Hays is lucky to have this one in the Walmart store. That is the very first time in years of splitting Subway sandwiches that any employee has inquired as to how we would like our meal served. 3) Ryan asked if we would like the two halves of our sandwich in separate trays. 2) The care with which our sandwich was prepared was exceptional. Three things stuck out and impressed me: 1) Ryan handled the unpleasant customer professionally, politely, and with a very level voice. Ryan was in the process of preparing our sandwich when another customer, a really contentious one, approached the counter and wanted to place his order immediately, even though it was obvious that the only employee in the store was busy at the moment with another customer. We always buy a foot-long turkey sandwich and split it. This particular store was outstanding in my opinion, primarily because of sterling performance on the part of the only employee (Ryan) on duty at.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |